25+ Years of Experience • Licensed & Insured • Free On-Site Estimate. We Respond Within 24 Hours.
Thank you.
A GetPro estimator will contact you within 24 hours to schedule your free on-site quote.
Cracked, stained, or failing concrete does not just look unprofessional. It creates liability exposure, fails safety inspections, and sends the wrong signal to every client, customer, or employee who walks through your facility.
Most contractors show up with a quote and disappear until the job starts. What follows are surprises at every stage: unexpected prep costs, extended timelines, and epoxy finishes that chip, peel, or delaminate within a year because the prep work was rushed.
Before GetPro recommends an epoxy system, we assess your slab and give you a clear, honest scope of work. You know exactly what you are getting before any crew sets foot on your floor.
Deteriorated concrete creates OSHA and safety compliance risk. Every inspection cycle is a liability exposure you cannot afford to ignore.
Peeling, delaminating epoxy means costly re-work and operational disruption. Poor surface prep is the number-one cause, and it’s the step most contractors skip.
Multi-week installation windows shut down production areas and cost more than the floor itself. You need a contractor who plans around your schedule.
High-build, chemical-resistant, and decorative epoxy systems engineered to resist stains, chemicals, impact, and daily wear. GetPro brings 25+ years of application experience to every slab in Southeast Michigan.
Built for forklift traffic, dropped tooling and wash-down. Ideal for warehouses, manufacturing facilities and any space that takes a beating.
Get a Coating EstimateMulti-layer epoxy systems built for continuous vehicle and foot traffic, with added build where floors see the most abuse.
Get a Coating EstimateChoose your color, texture and gloss level, with slip-resistant additives where they are needed. A clean, professional finish that holds up.
Get a Coating EstimateHeavy-duty epoxy floors that handle machinery, forklifts and daily industrial wear without chipping, staining, or delaminating.
A clean, professional epoxy finish that holds up to constant foot traffic and keeps your space looking sharp for years.
Stain-resistant, easy-to-clean epoxy floors that stand up to oils, solvents, wash-down and moisture all day, every day.
We evaluate slab condition, moisture and prior coatings before recommending an epoxy solution.
Surface is ground and cleaned for maximum adhesion and long-term performance.
Cracks, chips and damaged areas are fixed for a smooth, even finish.
Your chosen epoxy system is applied evenly across the prepared concrete surface.
A final protective topcoat locks in durability and shine for years of performance.
“We hired them for our warehouse flooring project. Their team was knowledgeable, efficient, and delivered outstanding results. Highly recommend.”
Our epoxy systems are engineered for forklifts, vehicles and constant foot traffic, not light residential use. Industrial-grade materials, professionally applied every time.
Protects your slab against oils, solvents, water and harsh cleaners. Critical for manufacturing, food service and automotive environments.
Most epoxy projects are completed in 1 to 2 days. We plan installation around your schedule to minimize disruption to your operations.
Choose your color, texture and gloss level. From solid industrial gray to decorative flake and metallic epoxy finishes.
Thousands of residential, commercial and industrial epoxy floors completed across Southeast Michigan. Same team. Same standards. Every project.
No hidden fees. A clear, honest scope of work before any crew sets foot on your floor, and upfront pricing from start to finish.
Here are the things most facility managers and property owners ask before requesting an epoxy estimate.
Get My Free Epoxy EstimateYes. Cracks, chips, stains and uneven areas are evaluated and repaired as part of our surface preparation process before epoxy is applied. Surface repair is built into our scope, not added as a surprise line item after you sign.
With proper installation and routine care, epoxy floors are built to last for years, even in high-traffic commercial and industrial environments. The key is correct surface preparation and choosing the right epoxy system for your specific use case, which is exactly what our assessment process covers.
Most epoxy coating projects are completed in 1 to 2 days, depending on floor size, slab condition and the system selected. We give you a clear timeline before any work begins, so you can plan your operations around it.
Yes. We serve Detroit and all of Southeast Michigan for commercial and industrial epoxy floor coating projects. Call (734) 822-9595 or fill out the form above and we will be in touch within 24 hours.
Our epoxy systems can include slip-resistant additives and decorative flake for added traction. We specify the finish around how the space is actually used, including wash-down and wet-process areas.
Free on-site quote, no obligation. We respond within 24 hours.